Find a HMRTC Route

Phase 3 to Delhi Gate Metro Route

Phase 3 Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹74
HMRTC ₹20 · DMRC ₹54
Smart Card Fare: ₹69
First Train: 06:19 AM
Last Train: 08:09 PM
Powered by ixigo & ONDC

Station-by-Station Route

28 stations 2 interchanges 30.5 km 0 hrs 52 mins
  1. 1
    Start at Phase 3 station.
  2. 2
    Board the Rapid Line towards Sector 55 56 · from Platform 1
    Ride 6 stops to Sikandarpur.
    Change lines here
  3. 3
    Board the Yellow Line towards Samaypur Badli · from Platform 2
    Ride 16 stops to Central Secretariat.
    Change lines here
  4. 4
    Board the Violet Line towards Kashmere Gate · from Platform 4
    Ride 4 stops to Delhi Gate.
  5. Arrive at Delhi Gate station. You have reached your destination. Exit Gates

Gurgaon Metro Route Map 2026

Route from Phase 3 to Delhi Gate on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Delhi Gate from Phase 3 by metro? Board the metro from Phase 3 station and travel through 26 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Delhi Gate.

The approximate travel time between Phase 3 and Delhi Gate is 0 hrs 52 mins. The total distance covered on this metro route is 30.5 Km. The first metro from Phase 3 departs at 06:19 AM, while the last train leaves at 08:09 PM.

The estimated metro fare for this route is ₹74. Smart card users may receive discounted fares. Parking facility is not available at either Phase 3 or Delhi Gate station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹74—
🏍 Bike₹264 ₹190 more
🛺 Auto₹396 ₹322 more
🚕 Cab₹650 ₹576 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹148₹137
Weekly (5 days)₹740₹686
Weekly (6 days)₹888₹823
Weekly (7 days)₹1,036₹960
Monthly (20 days)₹2,960₹2,744
Monthly (24 days)₹3,552₹3,293
Monthly (28 days)₹4,144₹3,842

Commuting with a Gurgaon Metro Smart Card saves up to ₹302 per month on this route.

Metro Ride Benefits

  • Carbon savings: 4.60 kg CO₂
  • Fuel savings: 2.03 litres
  • Time saved vs road: 39.2 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Cyber City, Road Number 19, U block, DLF Phase 3, Sector 24, Gurugram, Haryana 122002
Line & Network
Rapid Line Gurgaon Metro
Layout
Elevated (Side)
Areas Around
S Block Balveer Market Sector 24 Nathupur Phase 3
Station Amenities
Accessible

Address
Asaf Ali Road, Chatta lal Miya, Chandni Mahal, Chandni Chowk, New Delhi, Delhi 110002
Line & Network
Violet Line Delhi Metro
Contact
Layout
Underground (Island)
Areas Around
Daryaganj Chandni Mahal Shakti Sthal Bal Bhawan Vikram Nagar Delhi Gate
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 3 min 24 sec 4 min 45 sec
Saturday 4 min 00 sec 5 min 16 sec
Sunday 5 min 10 sec 5 min 10 sec
Nearby Bus Stop
202 m away
Buses from Delhi Gate
104 135 139 167 171 172 173 185 188 214CL 246CL 260 261 3 307 307STL 309EXT 348A 402CL 403CL 404 405 405A 405STL 419LSTL 425CL 429CL 429LSTL 429STL 429STL2 449A 457STL 706 729 753 770A 773 783 784 790 790A2 793 807A 838 838B 88A 901CL 917

Phase 3 to Delhi Gate Metro Route FAQs

There are 28 stations between Phase 3 and Delhi Gate on this metro route, spanning a total distance of approximately 30.5 km from end to end.

Yes, this journey starts on the Rapid Line from Phase 3 and ends on the Violet Line at Delhi Gate, so you will need to interchange 2 time(s) along the way.

The journey from Phase 3 to Delhi Gate takes approximately 0 hrs 52 mins at an average metro speed of around 35 km/h, covering 30.5 km in total.

This route starts on Gurgaon Metro at Phase 3 and ends on Delhi Metro at Delhi Gate, so you will interchange between two different operators' systems during the journey.

No, parking facility is not currently available at Phase 3 metro station, so if you are boarding the Rapid Line here, consider a drop-off or nearby alternate parking option.

No, parking facility is not currently available at Delhi Gate metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Phase 3 and Delhi Gate on this metro route is approximately 30.5 km, covered in about 0 hrs 52 mins at typical metro speeds.

Start on the Rapid Line at Phase 3 on Gurgaon Metro, then interchange onto the Violet Line to reach Delhi Gate on the Delhi Metro network at the other end.

The estimated normal fare from Phase 3 to Delhi Gate is ₹74, while smart card users can travel the same 30.5 km route for around ₹69.

The first metro from Phase 3 towards Delhi Gate departs at 06:19 AM, and the last train on this route leaves at 08:09 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.