Navi Mumbai Metro Line 1 Overview
Line 1 of the Navi Mumbai Metro is an elevated corridor developed by CIDCO and operated by Maha Metro. Its operational Phase 1 runs about 11.1 km from Belapur to Pendhar with 11 stations, serving Kharghar, Central Park and the Taloja area. Commercial service began on 17 November 2023. Further phases will extend the network towards Khandeshwar and Navi Mumbai International Airport. Explore the Navi Mumbai Metro Line 1 route map, full station list, interchanges, fares, timings and top attractions nearby.
Line 1 Station List 2026 (11 Active)
Parking Feeder Bus ATM Restroom
| # | Station | Amenities |
|---|---|---|
| 1 |
Belapur Terminal
|
|
| 2 |
RBI Colony
|
|
| 3 |
Belpada
|
|
| 4 |
Utsav Chowk
|
|
| 5 |
Kendriya vihar
|
|
| 6 |
Kharghar village
|
|
| 7 |
Central park
|
|
| 8 |
Pethpada
|
|
| 9 |
Amandoot
|
|
| 10 |
Pethali taloja
|
|
| 11 |
Pendhar
|
Line 1 Route Map 2026
Pan and zoom to explore the CIDCO Line 1.
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan
Line 1 History, Facts & Expansion
- Navi Mumbai Metro Line 1 was planned, built and funded by CIDCO and is operated by Maha Metro.
- Phase 1, from CBD Belapur to Pendhar, is about 11.1 km long with 11 elevated stations.
- Commercial operations began on 17 November 2023.
- Construction started in 2011, and the line opened several years later than its original 2014-16 target.
- The line serves CBD Belapur, Kharghar, Central Park, Taloja and Pendhar.
- Taloja is planned as an interchange with Mumbai Metro Line 12 from Kalyan.
- Line 1 uses 3-coach trains built by CRRC.
- The fare structure was revised in 2024 to make it among the cheaper metro systems in the Mumbai region.
- Central Park station serves Kharghar's large urban park.
- The line was delayed by contractor issues and was finally commissioned by Maha Metro.
Navi Mumbai Metro Line 1 Phase-wise Expansion
Phase 1 (2023) (Completed)
CBD Belapur-Pendhar, about 11.1 km with 11 stations, opened on 17 November 2023.
Phase 2: Taloja MIDC-Khandeshwar (Planned)
About 7 km with around 8 stations via Kalamboli.
Phase 3: Pendhar-Taloja MIDC Link (Planned)
A connector of about 2 km linking the two sections into one network.
Phase 4: Khandeshwar-Navi Mumbai Airport (Planned)
About 4.2 km link to Navi Mumbai International Airport.
Line 1 FAQs
Navi Mumbai Metro Line 1 has a total of 11 stations. The length of Metro Line 1 is 11.10 km which connects Belapur to Pendhar.
Navi Mumbai Metro Line 1 does not have any interchange stations and is not directly connected to other metro lines. However the planned interchange station will be CBD Belapur.
Yes, the Navi Mumbai Line 1 Line Metro is operational today. It runs as per its scheduled time. However, for any updates regarding delays or maintenance work, it is advisable to check the official website or app of Maharashtra Metro Rail Corporation Limited (Maha Metro).
Navi Mumbai Line 1 Line Timings
Navi Mumbai Line 1 runs on regular schedule throughout the week between Belapur Terminal and Pendhar.
Navi Mumbai Line 1 Timings from Monday to Saturday:
- First train: 06:00:00 AM (Belapur Terminal to Pendhar) | 06:00:00 AM (Pendhar to Belapur Terminal)
- Last train: 22:30:00 PM
Navi Mumbai Line 1 Timings on Sunday:
- First train: 06:00:00 AM (Belapur Terminal to Pendhar) | 06:00:00 (Pendhar to Belapur Terminal)
- Last train: 22:30:00 PM
CBD Belapur is the only station on the Navi Mumbai Metro Line 1 that is connected to the Indian Railways. It provides direct connectivity to Khandeshwar railway station.
Yes, there are plans to extend the metro from Pendhar to MIDC and Taloja in the future.
No, the Navi Mumbai Metro does not connect directly to the Mumbai Metro. However, future expansion plans have plans to connect via Metro Line 8.
The nearest Navi Mumbai Metro station to Mumbai-Pune Expressway is Khandeshwar Metro Station.
No, Mumbai Metro and Navi Mumbai Metro have different ticketing systems. You need to buy a separate smart card or token for Navi Mumbai Metro.