Mumbai Monorail Line 1 Line Route Map
The Line 1 Line is a metro line of the Mumbai Monorail, a rapid transit system in Mumbai, India. It consists of 17 active stations of all Mumbai Monorail network and operated by Mumbai Metropolitan Region Development Authority (MMRDA). Explore Line 1 Line metro route details, also stations list, route map, interchange, fares, time and distance between source and destination, and top attractions nearby etc.
Sign: 🚆 Elevated, 🚇 Underground, 🚝 At Grade, 🅿️ Parking
Line 1 Line Metro Stations List 2024 | Interchange | Layout |
---|---|---|
◉ Chembur Monorail | ⇓ | 🚆️ |
◉ VNP and RC Marg Junction Monorail | ⇅ | 🚆️ |
◉ Fertiliser Township Monorail | ⇅ | 🚆️ |
◉ Bharat Petroleum Monorail | ⇅ | 🚆️ |
◉ Mysore Colony Monorail | ⇅ | 🚆️ |
◉ Bhakti Park Monorail | ⇅ | 🚆️ |
◉ Wadala Depot Monorail | ⇅ | 🚆️ |
◉ GTB Nagar Monorail | ⇅ | 🚆️ |
◉ Antop Hill Monorail | ⇅ | 🚆️ |
◉ Acharya Atre Nagar Monorail | ⇅ | 🚆️ |
◉ Wadala Bridge Monorail | ⇅ | 🚆️ |
◉ Dadar East Monorail | ⇅ | 🚆️ |
◉ Naigaon Monorail | ⇅ | 🚆️ |
◉ Ambedkar Nagar Monorail | ⇅ | 🚆️ |
◉ Mint Colony Monorail | ⇅ | 🚆️ |
◉ Lower Parel Monorail | ⇅ | 🚆️ |
◉ Sant Gadge Maharaj Chowk Monorail | ⇑ | 🚆️ |
Mumbai Monorail Line 1 Line Details
Line colorLine color is for indication purpose only. | Line 1 ▣ |
Length of linePhysical length (distance between start and end) of Line 1 line. | 15 KM |
Active stationsActive and functional stations count of Line 1 Line. | 17 stations |
Inactive stationsCount of proposed or under-construction stations for Line 1 line extension. | No station |
Terminal stationsStart and End Stations of Line 1 Line | Chembur Monorail ⇄ Sant Gadge Maharaj Chowk Monorail |
InterchangeNo. of lines connected or interchange count on Line 1 line. | No Interchange. |
Interesting facts about Mumbai Monorail Line 1 line
- On opening day, 19,678 passengers travelled on the line.
- Sixty-six services were operated on the first day
- According to the MMRDA, between 2 February and 1 March, a total of 4,58,871 commuters used the monorail, generating a total revenue ₹44,66,522.
- Phase 2 of Line from Wadala Depot to Jacob Circle was inaugurated by Chief Minister Devendra Fadnavis on 2 March 2019.
- Each monorail train consists of 4 coaches having a combined passenger capacity of 568 passagers.
Mumbai Monorail News & Updates 2024
Mumbai Monorail Line 1 Line Route FAQs:
𝒜. The Mumbai Monorail Line 1 line has total 17 stations which includes elevated, overground, and underground stations.
𝒜. The Mumbai Monorail Line 1 line has no interchange stations and not connected with other lines of the metro directly.
𝒜. You should check the official website or offical twitter handle for this information.
𝒜. The length of Mumbai Monorail Line 1 Line is 15 KM, and it's terminal stations are Chembur Monorail & Sant Gadge Maharaj Chowk Monorail.
Top Attractions on Mumbai Monorail Line 1 Line
Attraction | Nearest Metro (Distance) |