Patna Metro

Patna Metro Red Line

Operator: Delhi Metro Rail Corporation (DMRC)

Total Stations

0 Active / 16 Inactive

Line Length

16.86 km

Line Status

Inactive

Patna Metro Red Line Overview

The Patna Metro Red Line is an upcoming metro line under Phase I of the Patna Metro network. It features 13 stations currently under construction, aimed at enhancing connectivity across major residential and commercial zones in Surat. Explore complete details of the Red Line metro route, including the station list, route map, interchanges, fares, travel time, distance between stations, and top nearby attractions etc.

Patna Metro Red Line Station List (0 Active)

Status legend: Parking Feeder Bus Bank ATM Sulabh/Restroom

Under Construction / Planned Station
Danapur Cantonment
Saguna Mor
RPS Mor
Patliputra
Rukanpura
Raja Bazar
Patna Zoo
Vikas Bhawan
Vidyut Bhawan
Patna Junction
Interchange
Mithapur
Ramkrishan Nagar
Jaganpura
Khemnichak
Interchange

Patna Metro Red Line Map 2026

View the updated Red Line map of Patna Metro, featuring active stations, under-construction stations, interchanges, and the metro Red line route.

View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan

Patna Metro Fare Chart

Patna Metro Red Line History, Facts and Expansion Plan

Get insights about the history, facts, and expansion plans of the Patna Metro Red Line, including details about its development, infrastructure growth, and future improvements in connectivity.

  • The Red Line is the first corridor (Corridor 1) of the Patna Metro, connecting Danapur Cantonment to Khemnichak.
  • It is approximately 16.86 km long, with 9.36 km elevated and 7.5 km underground, connecting Danapur Cantonment to Khemnichak.
  • This corridor has a combination of elevated and underground stations. It will have 14 stations.
  • The maximum speed of metro trains on the Red Line is 80 km/h.
  • Most of Corridor 1 is underground due to the Rupaspur Railway Overbridge (ROB) and the Jagdevpath-Sheikhpura Mor flyover.
  • The 8 km (4.97 mi) underground section of Line 1, extending from Rukunpura station to Patna Junction station, has not yet been allotted.
  • The entire Red Line is expected to be completed by 2027, and some sections of it have already been opened for public use.

Patna Red Line Metro News & Updates

Get the news and updates for Red Line of Patna Metro, including operational changes, expansion plans, station upgrades, and key announcements for commuters in Patna.

2026-05-12 patna News 18

The Khemichak Interchange Metro Station—the first of its kind for the Patna Metro—is set to become the city's primary connectivity hub. From this station, trains on Corridor 1 will travel via Jaganpura and Mithapur to reach Patna Junction. Meanwhile, trains on Corridor 2 will proceed to Patna Junction via Malahi Pakri, Rajendra Nagar, PMCH, and Gandhi Maidan. A significant highlight is that Patna Junction is also being developed as an interchange station; in fact, it will be the largest interchange station in the network. Consequently, passengers departing from the Khemichak Metro Station will be able to travel with ease to various parts of Patna.

2026-04-19 Patna Times of india

The Patna Metro Depot, being developed near the New Pataliputra Interstate Bus Terminal (ISBT) at Bairiya Chak in Sampatchak, is nearing completion. Spread over 32.77 hectares, this depot will not only be a parking space for trains; it will also be a powerful hub monitoring every activity across the city's metro network. Called the "brain" of the Patna Metro, controllers at this depot will be able to track which train is at which station and its actual speed through large screens and sensors installed in the main command center. In case of any emergency, instructions will be issued to trains from here to ensure the safety of passengers.

2026-02-06 Patna Native Planet

The Patna Metro Rail Corporation (PMRC) is nearing completion of the final two elevated stations—Malahi Pakadi and Khemnichak—on its priority metro corridor. Both stations are now in the final stages of construction, and metro services on this extended section are expected to begin by the end of this month.

2026-01-26 Patna Patna Press

पटना मेट्रो के कॉरिडोर-2 का काम एक महत्वपूर्ण चरण में प्रवेश कर चुका है, पीएमसीएच स्टेशन और गांधी मैदान के बीच सुरंग खोदने का काम आधिकारिक तौर पर शुरू हो गया है। पहली टनल बोरिंग मशीन (टीबीएम) लगभग 20 मीटर की खुदाई कर चुकी है, जबकि दूसरी टीबीएम से काम शुरू करने की तैयारियां चल रही हैं। अधिकारियों को उम्मीद है कि दूसरी मशीन एक सप्ताह के भीतर काम शुरू कर देगी, जिससे शहर के भूमिगत नेटवर्क के इस महत्वपूर्ण हिस्से

2026-01-20 Patna Metro Rail News

SYSTRA को पटना मेट्रो लाइन 1 के 6 अंडरग्राउंड स्टेशनों के लिए डिटेल्ड डिज़ाइन कॉन्ट्रैक्ट मिला है। ये स्टेशन पटना मेट्रो के पैकेज PC-05 और PC-06 का हिस्सा हैं। हिंदुस्तान कंस्ट्रक्शन कंपनी लिमिटेड (HCC) को सितंबर 2025 में दिल्ली मेट्रो रेल कॉर्पोरेशन (DMRC) से पटना मेट्रो के पैकेज PC-05 और PC-06 के लिए लेटर ऑफ़ एक्सेप्टेंस (LOA) मिला था। InnoMetro के छठे एडिशन में शामिल हों और जानें कि AI में हुई तरक्की से टिकटिंग सिस्टम, ट्रेन और सिग्नलिंग जैसे रेलवे सिस्टम कैसे बेहतर हो रहे हैं। 21-22 मई, 2026 को भारत मंडपम, नई दिल्ली में होने वाले भारत के सबसे बड़े मेट्रो और रेलवे शो में 200 से ज़्यादा एग्ज़िबिटर्स के इनोवेशन देखें।

Patna Metro Other Lines & Routes

Patna Metro operates 1 active metro lines, including the Red Line. Explore other metro lines to understand their routes, stations, interchanges, and connectivity across the Patna Metro network.

Saved Routes
No saved routes yet.
Tap Save Route on any route page.