Find a {networkName} Route

Hyderabad Metro logo

Red Line

Hyderabad Metro Rail Limited (HMRL)
Active
27
Stations
27 Active
29 km
Line Length
Terminal Stations

Hyderabad Metro Red Line Overview

The Red Line is a metro line of the Hyderabad Metro, a rapid transit system in Hyderabad, India. It consists of 27 active stations of all Hyderabad Metro network. Explore Red Line metro route details, also stations list, route map, interchange, fares, time and distance between source and destination, and top attractions nearby etc. YoMetro helps you with information about the Hyderabad Metro route, first/last train timings, metro route map, fare chart, interchange, top tourist attractions near a metro station, metro news and more.

Red Line Route Map 2026

Pan and zoom to explore the HMR Red Line.

Loading map…
100%
Scroll to zoom · Drag to pan

Red Line History, Facts & Expansion

  • The Hyderabad Metro Red Line, also known as Corridor 1, began operations on 29 November 2017. This was the first operational line of Hyderabad Metro.
  • The line is 29.21 km long and spans 27 stations from Miyapur to LB Nagar.
  • A special purpose vehicle company, L&T Metro Rail Hyderabad Limited (L&TMRHL), was set up by construction company Larsen & Toubro (L&T) to develop the Hyderabad Metro Rail project.
  • Trains arrive every 5–10 minutes during peak hours and every 10–15 minutes during non-peak hours, providing a frequency tailored to passenger needs.
  • The Red Line is planned to be extended beyond both its terminals under the second phase of the metro development project. From LB Nagar it is being extended to Hayat Nagar, while from Miyapur it will connect Patancheru.

Hyderabad Metro Red Line Extension in Phase 2

The Hyderabad Metro's Red Line, which currently operates from Miyapur to LB Nagar, is proposed for expansion under Phase 2. Under this plan, the Red Line will be extended by about 12 km from Miyapur to Patancheru and 5 km from LB Nagar to Hayathnagar.

7 new stations will be built between Miyapur to Patancheru and 4 new stations between LB Nagar to Hayathnagar. It will be completely elevated.

Also, it will facilitate interchange with other metro lines. The project is targeted to be completed by 2028.

Other Hyderabad Metro Lines

Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.